DBC offers a special deal for the structural work for villas in Mutla’.

2 1/4 Floors

(650m2 Built-up Area)

KD 18,850/-

Includes labor and tools

KD 22,000/-

+ subsidized materials
Includes labor, tools and materials

2 1/4 Floors

(1,050m2 built-up area, full basement)

KD30,450 /-

Includes labor and tools

KD48,750 /-

+ subsidized materials
Includes labor, tools and materials

2 1/2 Floors

(650m2 Built-up Area)

KD18,850 /-

Includes labor and tools

KD22,000 /-

+ subsidized materials
Includes labor, tools and materials

2 1/2 Floors

(1,360m2 built-up area, full basement)

KD39,440 /-

Includes labor and tools

KD72,000 /-

+ subsidized materials
Includes labor, tools and materials

3 Floors

(650m2 Built-up Area)

KD18,850 /-

Includes labor and tools

KD22,000 /-

+ subsidized materials
Includes labor, tools and materials

Details

  • Concrete from ACICO
  • Aerated Block Work from ACICO or NIC
  • Reinforcement Steel from Kuwait United Steel Company
  • CMU from Al-Messila Blocks
  • Cement from Kuwait Cement Factory
  • Product data sheets and proof of purchase to be submitted to Owner
  • Concrete tests performed in INCO Laboratory and submitted to Owner
  • Professional supervision by engineers
  • Excavation, shoring and dewatering not included
  • Final price depends on the final design and drawings
×
v
-->